CDS website
CDS CDS Surveys and Architecture CDS Sport
CDS Design and Management
CDS Design and Management CDS Design and Management
INTRODUCTION
SERVICES:
Cemetery Design
Case Studies
Cemetery Drainage
Environmental Audits
Surveys and Mapping
EMI
Memorial Stability Testing
Greywater Management
Pandemic Planning
PRODUCTS:

Vaults and Chambers

Flexivault Burial Chambers

Memorial Bearer

Shefford Shoe
PDF DOWNLOADS
CDS FORUM
CLIENT AREA
LATEST NEWS
CONTACT US
Cemetery Drainage

Drainage in cemeteries is complex due to the physical, environmental and practical constraints.

CDS have specialised in the drainage of cemeteries designing bespoke solutions to surface and groundwater problems. CDS designed and managed to completion the country’s first cemetery deep groundwater drainage project. Other competitive companies now use this method.

deep drainage deep drainage deep drainage
Deep drainage in progress Drainage exceeds 3 meters Site graded and seeded

CDS specialist consultants can provide technical services in the management of the following areas:

deep drainage deep drainage
drainage map during deep drainage

EMI Mapping

The EMI  scan will provide target sampling points from which the soil profile will be analysed for its mineralogy and profile construction .  Determining  where soil variability exist as well as locating and defining metallic and electrical utilities and potential below ground constructions and obstructions can be extremely beneficial in providing cost benefits through well engineered designs.

The EMI technology was developed in the UK by Martin Peters and Justin Smith and is widely used by other companies however its use is limited in many situations and we would advise potential users to be aware that it can sometimes be used as an expensive marketing tool rather than providing for good field data.

CDS EMI scan

CDS EMI scan

CDS EMI scan

 

CDS undertake a three staged approach:

Stage 1 - The survey

Before any assumptions are made as to the causes of the drainage problem our soil water team undertakes a detailed survey. This survey includes:

From the results of the initial field and desktop survey and extensive site investigation an engineer will determine:

  • The water table levels both current and temporal
  • The risk of leaching, eutrophication and attenuation
  • The presence, and causes, of any impermeable layers in the soil profile
  • The soil stability and suitability for excavations
  • The drainage and surface water management options

The production of a detailed written report with outline management options will be presented to the client highlighting the type of drainage problem and a summary of design options and likely budget costs.

Stage 2 - Design

Once the budgets and type of drainage scheme has been agreed CDS will progress with Stage 2 This would include the:

Stage 3 - Project Management

CDS ensure that all aspects of the design are finished on time and on budget by providing an ongoing client relationship package.

CDS engineers will ensure that the contractors are fully informed and briefed on the work in hand and will monitor the projects progress form start to completion.

  • Prepare in conjunction with Quantity Surveyor, contract documentation for works.
  • Lease and advise on appointment of specialist sub-contractors.
  • Accept site on behalf of contractor, issue working drawings and details.
  • Prepare anticipated monthly cash flow forecast expenditure.
  • Prepare and administer the construction, design and management (CDM) regulations.
  • Make periodic visits to site as required to generally oversee project.
  • Assess progress and ensure it is in line with the agreed programme.
  • Liase with Local Authority.
  • Issue of any variation orders etc, issue payment certificates in conjunction with Quantity Surveyor and agree final account.
  • Carry out final inspection.
  • Produce list of emedial as necessary.
  • Accept work on behalf of the Local Authority.
  • General administrative duties.